Skip to content
Back to solutions§ 00 · PACKAGE · 2026
Packaged solutionFLEET · ONLINE

Warehouses & fulfillment

AGV/AMR robots for warehouses, fulfilment and distribution centers: picking, zone-to-zone movement, inventory, WMS integration. Scales from a pilot of a few units to dozens — we start on a small area and expand.

Where it fits
Warehouses · fulfilment
Start
From 3 AGV/AMR
Integration speed
Low
Cycle to launch
From 2 months

CAM·01 · SERVICE FLOORSRV-FLEET · REV.2026

§ APPROACH · 2026§ 01

Where this package actually helps

Four typical challenges in this segment — and what changes on the client side once the package is in place.

  1. Challenges · 01

    On many warehouses, payroll and related costs are one of the key operating-expense lines. As wages rise and qualified staff is harder to find, this line grows faster than revenue.

    Solutions · 01

    We move 40—60% of routine moves and picking onto AGVs. Payroll savings become predictable and stop tracking wage inflation — and you can start with a pilot on a small area.

  2. Challenges · 02

    Staff turnover and picking errors. Every shift is a quality loss point and time stolen on rechecks.

    Solutions · 02

    We remove the human factor from 60—80% of picking: AGVs run typical routes with repeatable precision. Errors and losses drop systemically.

  3. Challenges · 03

    Productivity ceiling on manual operations. Scaling the business hits the hiring funnel, which takes months.

    Solutions · 03

    We close the manual-ops ceiling without hiring. Add units or throughput per the seasonal plan in days — not months of recruitment and training.

  4. Challenges · 04

    Peak loads — Black Friday, season, promos. Finding skilled temporary staff is hard and expensive.

    Solutions · 04

    We restore peak-time stability: the same fleet covers baseline and seasonal spikes — no overtime, no rush hiring.

REV.2026 · NODE GZ-01

§ EXAMPLE · 2026§ 02

What it looks like in practice

Two illustrative scenarios — the order of investment, timeline and effect. Figures are indicative; a precise estimate for your site is in the calculator below.

E-commerce warehouseFRAME · 01
E-commerce warehouseExample estimate · indicative figures

Inputs

~1,500 m² warehouse, 800–1,200 orders/day, manual picking, peak-season dips.

What we deploy

  • 5 AMR (goods-to-person)
  • Warehouse mapping
  • Basic WMS integration

On-site launch

≈ 6 weeks

Effect & payback

Picker travel −60–70%, picking throughput ≈×2. Payback ≈ 14–20 mo.

Production warehouseFRAME · 02
Production warehouseExample estimate · indicative figures

Inputs

~4,000 m² warehouse, pallet moves between shops, shortage of forklift drivers.

What we deploy

  • 6 AGV (pallet tuggers)
  • Charging stations
  • Route dispatching

On-site launch

≈ 10 weeks

Effect & payback

People off the movement routes, running 2–3 shifts. Payback ≈ 18–24 mo.

Calculate for your site

REV.2026 · SAMPLE 2/2

§ INCLUDED · 2026§ 03

What's in the package

A ready-made configuration for the task — no separate sourcing and no grey areas of accountability: equipment, integration, training and service at launch assembled as one system.

AGV/AMR robots for the task01

AGV/AMR robots for the task

RACK TRANSPORT · UP TO 1,000 KG

Warehouse mapping02

Warehouse mapping

LIDAR MAP · ROUTES · ZONES

WMS integration03

WMS integration

TASK EXCHANGE · API · REAL-TIME

§ SYSTEM · INCLUDED MODULES · 202605 MODULES · ◢ BUS
  1. 01

    AGV/AMR robots for the task

    Geek+, Quicktron and others for the task: picking, pallet movement, inventory. Start with a pilot of a few units and scale.

  2. 02

    Warehouse mapping

    Marker installation, route layout, work zone and charging station definition. Done on-site in 1—2 days.

  3. 03

    WMS integration

    Standard connectors for SAP, Manhattan, 1C, Logistic Vision. Custom integrations via API or CSV.

  4. 04

    Operator training

    Two-day course for operators and shift lead. Russian / English video manuals, maintenance protocols.

  5. 05

    Service for the first 3 months

    Included in the package: scheduled maintenance, engineering support, consumables. Then — a separate service contract.

REV.2026 · 05 MODULES

§ ROLLOUT · 2026§ 04

How rollout runs

From kickoff to handover — five linear stages. Each one delivers a concrete output, names the accountable side, and has a stated duration. Total budget, exact dates and the risk register are locked in the contract.

  1. 01/051—2 weeks

    Site audit

    Floor-plan survey, operations analysis, integration requirements capture. Included in the contract package — not billed separately.

    Lead · Nexum CN · engineering team

    Stage deliverable

    Technical report + 3 configuration options with indicative budget

  2. 02/054—6 weeks

    Sourcing and procurement

    Configuration alignment, OEM batch procurement, physical acceptance at the factory before shipment.

    Lead · Nexum CN + OEM engineers

    Stage deliverable

    FAT report PDF + serial numbers of the full batch

  3. 03/052—4 weeks

    Logistics and customs

    Sea or air freight from Shenzhen to the client's site, customs clearance in the importing country.

    Lead · Logistics operator + Nexum

    Stage deliverable

    Packing list + commercial invoice + units on the client's warehouse

  4. 04/051—2 weeks

    Installation and mapping

    Charging station installation, route deployment, test run with real operations.

    Lead · Nexum field engineers on-site

    Stage deliverable

    Deployed routes on the warehouse + test-run log

  5. 05/051 week

    Training and go-live

    Staff training, controlled go-live, gradual ramp-up to full load.

    Lead · Nexum + client-side owner

    Stage deliverable

    Certified client operators + acceptance protocol

REV.2026 · 05 STAGES

§ REFERENCE · 2026§ 05

The same class of AGV solution already powers the largest warehouses in China

Our job is to open access to the same class of equipment and integration for a warehouse of your size, with local service.

Case · 01◢ REF

JD.com

Scale
Jinan · 100 000 m²
Robots
300+ Geek+ AGV

Per public integrator data — order-of-magnitude picking acceleration and significant manual-labour reduction on this class of AGV deployments.

Case · 02◢ REF

Cainiao (Alibaba)

Scale
Wuxi · 50 000 m²
Robots
200+ Quicktron

Per public data — order-of-magnitude reduction in order-assembly time after AGV fleet rollout.

Case · 03◢ REF

Mengniu Dairy

Scale
Inner Mongolia · 30 000 m²
Robots
120 AGV

Solution scaled across typical inter-zone movement operations. Specific operational figures — per integrator data.

Manufacturer reference cases from public sources and industry reviews. Specific figures depend on the site and are confirmed by a calculation after audit.

REV.2026 · REF 3/3

§ ESTIMATE · 2026§ 06

Payback on your inputs

Enter your inputs — get an estimated payback period. Final proposal is prepared after a short audit.

Scenario
Mode3 inputs — payroll baseline

Your inputs

Effective AGV operating zone

Movements and picking combined

Average per month, USD

Result

Package cost (estimate)
6 ×$175,000
Annual saving
$98,000
Payback period
1.8 yr
Within industry norm

Indicative calculation. In Simple mode it captures direct labour-cost effect; Advanced additionally adds error losses, revenue uplift and operational effects. A full proposal is prepared after a short audit of your site.

Numbers locked in

Save this scenario — we'll prepare a proposal

We tailor a commercial proposal to your site and reply within one business day, in your timezone.

REV.2026 · CALC LIVE

§ REQUEST · 2026§ 07

Request a quote for the “Warehouses & fulfillment” package

Initial response — usually within one business day. Preliminary configuration and budget — after we clarify the site parameters.

PackageWarehouses & fulfillment
Your robotics experience

REV.2026 · INTAKE